As far as I am aware, peak train load surveys are meant to be performed every six months (March and September). Is there data available for the Sydney Trains network that’s more recent than March 2016?
Apologies for the delayed response.
Peak train load survey has been replaced by another internally used model therefore the train loads by line visualisation will no longer be updated. If there is a specific service/line / period we can make a request through our Transport Performance and Analytics team.